Hotline:0981.495.038
contact@intechgroup.vn

Hospital M&E System Turnkey Design and Construction

The M&E system is one of the essential items in hospitals, playing a crucial role in ensuring the safe, efficient, and continuous operation of medical services. With the One-Stop-Service ecosystem, INTECH Group is not only highly regarded in the fields of workshop, clean room design and construction but also one of the leading contractors in Vietnam in the field of design and construction of M&E systems for healthcare facilities and hospitals.

Main items in the design and construction of hospital M&E system

HVAC (Heating, Ventilating, and Air Conditioning) System

The HVAC system, short for Heating, Ventilating, and Air Conditioning, includes heating, ventilation, and air conditioning systems. It is crucial in hospitals to ensure environmental factors such as temperature, humidity, light, and air quality meet standards.

CLEANROOM SYSTEM

Cleanrooms in hospitals are designed to control airborne microorganisms, ensuring that the concentration of particles in the air and does not affect temperature, humidity, or pressure. In hospitals, cleanrooms are typically operating rooms, delivery rooms, post-operative recovery rooms, and isolation rooms for infectious diseases. These rooms maintain control over air contamination from both internal and external environments, ensuring compliance with strict hospital cleanroom standards. Cleanrooms protect patients and healthcare workers by minimizing the risk of infection and ensuring safety during procedures.

ELECTRICAL SYSTEM

Electromechanical system, lighting system.
Low-voltage electrical system: Internet, Telephone system, Security camera surveillance system, Public address (PA) system.

Auxiliary system

INTECH provides consultation, design and installation services for hospital auxiliary systems such as: Fire Protection and Prevention System, Power Generation System, Gas System, Clean Water Supply System, Domestic Water Supply System, Wastewater Treatment System….

WHY SHOULD YOU CHOOSE INTECH GROUP?

banner
OPTIMIZATION
Owning a team of leading experts, engineers, and experienced professionals in the field of consulting, design, and implementation of M&E systems, cleanroom systems for hospitals, healthcare facility. INTECH Group commits to providing customers with the most optimal and effective solutions.
banner
STANDARD COMPLIANCE
INTECH Group commits strict adherence to design and construction standards for hospital M&E systems, operating rooms, IVF rooms, tissue banks, medical equipment manufacturing cleanrooms…
banner
REASONABLE COSTS
With the advantage of having manufacturing facilities and being distributors for equipment brands, INTECH Group consistently ensures competitive pricing compared to the quality of its products and services
banner
CONSTRUCTION AND INSTALLATION ON SCHEDULE
INTECH Group always meets urgent time requirements, executing tasks the most promptly and efficiently within the industry.
banner
24/7 SUPPORT
INTECH Group is always ready to provide comprehensive, detailed assistance and prompt support to all customers with a dedicated and experienced Customer Care team.
banner
PROVEN REPUTATION
INTECH Group has satisfied numerous domestic and international customers, particularly those from South Korea, Japan, the United States, China…

WORKING PROCEDURES

RECEIVING REQUESTS
INTECH Group receives requests from the Hospital. Conducting on-site surveys: INTECH technicians and engineers will survey the site, gather current information: Power supply, Water supply/drainage, Status of the construction site, and detailed requirements from the Hospital.
Step 1
CONSULTATION AND DESIGN
Based on functional requirements, detailed requirements, and site conditions, we provide solutions and present designs and estimates. The design is then finalized in agreement with the Hospital before proceeding with construction approval.
Step 2
CONSTRUCTION
Negotiate and sign the contract, receive the site, and proceed with the construction according to the approved design and construction methods agreed upon with the Hospital. Strict control is maintained to ensure quality, quantity of equipment and materials, safety requirements, and construction standards.
Step 3
INSPECTION AND ACCEPTANCE
Conduct internal inspection to ensure that the construction meets the design specifications. Official acceptance inspection with the Hospital is carried out before handover for use.
Step 4
MAINTENANCE, CUSTOMER CARE
Regular maintenance, warranty for 12-24 months depending on the nature of the project. Lifetime technical support for the project. We commit to being present immediately to resolve any issues to ensure the operation of the project with the best quality.
Step 5

TYPICAL PROJECTS

CONTACT